List of Deliverables:
| No. |
Deliverable Name |
WP |
Nature |
Dissemination Level | Delivery Date |
| D.110.1 |
Project Management Guideline and Quality Plan | 110 | R | RE | T0+1 |
| D.110.2 |
Quarter-Term Report | 110 | R | RE | T0+9 |
| D.110.3 |
Mid-Term Report | 110 | R | RE | T0+18 |
| D.110.4 |
Third-Quarter Report | 110 | R | RE | T0+27 |
| D.110.5 |
Exploitation Plan (Draft 1) | 110 | R | RE | T0+12 |
| D.110.6 |
Exploitation Plan (Draft 2) | 110 | R | RE | T0+24 |
| D.110.7 |
Final Report on Exploitation Plan | 110 | R | RE | T0+36 |
| D.110.8 |
Final Report, Cost Statement and Audit Certificates | 110 | R | RE | T0+36 |
| D.120.1 |
DITSEF website | 120 | O | P | T0+1 |
| D.120.2 |
Dissemination Plan | 120 | R | RE | T0+6 |
| D.120.3 |
Dissemination Report (Intermediate Version) | 120 | R | RE | T0+18 |
| D.120.4 |
Disemination Report (Final Version) | 120 | R | RE | T0+36 |
| D.210.1 |
Report of the first workshop (incl. scenarios, requirements...) |
210 | R | P | T0+2 |
| D.210.2 |
Report of the second workshop (draft of preliminary system definition) | 210 | R | P | T0+6 |
| D.220.1 |
Report of the third workshop (final preliminary system definition and first analysis of R&D support) | 210 | R | P | T0+11 |
| D.220.2 |
Report of the fourth workshop | 220 | R | RE | T0+27 |
| D.230.1 |
Report of the fifth workshop | 230 | R | RE | T0+34 |
| D.230.2 |
Results of the End-Users' Demonstration | 230 | R | RE | T0+36 |
| D.310.1 |
System Preliminary Definition | 310 | R | RE | T0+10 |
| D.320.1 |
Technical coherence report of sub-systems with the system definition and operational end-users needs. | 320 | R | RE | T0+29 |
| D.330.1 |
Evaluation of Performances and Roadmap | 330 | R | RE | T0+36 |
| D.330.2 |
DITSEF Roadmap | 330 | R | RE | T0+36 |
| D.410.1 |
DITSEF Communication Sub-system Specification (preliminary version) | 410 | R | RE | T0+22 |
| D.410.2 |
DITSEF Communication Sub-system Specification (final version) | 410 | R | RE | T0+29 |
| D.410.3 |
Sensor Abstraction Layer and API | 410 | R, P | RE | T0+18 |
| D.420.1 |
DITSEF Indoor Positioning Sub-system Specification (preliminary version) | 420 | R | RE | T0+22 |
| D.420.2 |
DITSEF Indoor Positioning Sub-system Specification (final version) | 420 | R | RE | T0+29 |
| D.420.3 |
Data bearer specification | 420 | R | RE | T0+15 |
| D.430.1 |
HABBLE-Net Equipment Components | 430 | P | RE | T0+30 |
| D430.2 |
Equipment for Tactile Communications | 430 | P | RE | T0+30 |
| D.440.1 |
Demonstration readiness for end-users demo | 440 | P | RE | T0+33 |
| D.510.1 |
DITSEF Sensor spatial system specification (preliminary version) | 510 | R | RE | T0+30 |
| D.510.2 |
DITSEF Sensor spatial system specification (final version) | 510 | R | RE | T0+29 |
| D.520.1 |
SAW/sol-gel sensor array with various sensitive layers for the detection of the targeted pollutants and data acquisition system specification (preliminary version) | 520 | R | RE | T0+22 |
| D.520.2 |
SAW/sol-gel sensor array with various sensitive layers for the detection of the targeted pollutants and data acquisition system specification (preliminary version) | 520 | P | RE | T0+29 |
| D.530.1 |
Sensor system components for demonstration (SAW, etc.) | 530 | P | RE | T0+30 |
| D.530.2 |
Performance specifications (in terms of robustness, portability, operability) report for sensor equipment | 530 | R | RE | T0+30 |
| D.540.1 |
Sensor demonstrator for user demo | 540 | P | RE | T0+33 |
| D.610.1 |
Tactile interface specification (preliminary version) | 610 | R | RE | T0+22 |
| D.610.2 |
Tactile interface specification (final version) | 610 | R | RE | T0+29 |
| D.620.1 |
Enhanced Vision HMI specification (preliminary version) | 620 | R | RE | T0+22 |
| D.620.2 |
Enhanced Vision HMI specification (preliminary version) | 620 | R | RE | T0+29 |
| D.630.1 |
Functional equipment of user interface | 630 | P | RE | T0+30 |
| D.640.1 |
HMI Demonstrator for user demo | 640 | P | RE | T0+33 |
| D.730.1 |
DITSEF Demonstrator – Lab Version | 730 | O | RE | T0+33 |
| D.730.2 |
Validation Plan | 730 | R | RE | T0+30 |
| D.730.3 |
Validation report | 730 | R | RE | T0+33 |
| D.740.1 |
DITSEF Demonstrator – Real Environment Version | 740 | O | RE | T0+34 |
| D.740.2 |
Demonstration Report | 740 | R | RE | T0+34 |
NOTE: Deliverable date is measured in months from the project start date.
LEGEND: Nature: R = Report, P = Prototype, D = Demonstrator, O = Other
Diss. Level: P = Public, RE = Restricted to a group specified by the consortium.